| Annual Report 2010-2011 |
|
|
Download |
| Electrical Safety Presentation |
|
|
Download |
| Guidelines for fines |
|
|
Download |
| Guidelines for processing of licences |
|
|
Download |
| Annual Report 2009-2010 |
|
|
Download |
| Tariff Review Report 2010 |
|
|
|
a. BPC Tariff Review Report 2010
|
Download |
b. DGPC Tariff Review Report 2010
|
Download |
| Forms |
|
|
|
|
Download |
| Public Hearing Procedure |
|
|
|
Public Hearing Procedure for Tariff Determination
|
Download |
| presentations made by the BEA Secretariat, BPC and DGPC at the Public Hearing: |
|
|
|
a. BEA Presentation on BPC tariff proposal
|
Download |
b. BPC Tariff Presentation
|
Download |
c. BEA Presentation on DGPC tariff proposal
|
Download |
d. DGPC Tariff Presentation
|
Download |
| DGPC Tariff Proposal March 2010 |
|
|
|
Download |
|
|
Download |
c. 2009 DGPC consolidated model
|
Download |
d. 2009 DGPC consolidated model
|
Download |
|
|
Download |
|
|
Download |
|
|
Download |
h. CO_Assets_allocated_to_plants
|
Download |
|
|
Download |
j. Investment Report Final
|
Download |
k. Tariff_revision_proposal24mar
|
Download |
| BPC Tariff Proposal March 2010 |
|
. APPENDICES A1 A4 B C1 C2(Option A Proposal Tariff Structure Calculation)
|
Download |
. APPENDICES(Option B Proposal Tariff Structure Calculation)
|
Download |
. APPENDIX D1(Subsidy requirement for Option A)
|
Download |
. APPENDIX D2 (Subsidy requirementfor Option B)
|
Download |
. APPENDIX D3 (Subsidy requirement under DGPC Tariff I)
|
Download |
. APPENDIX D4(Subsidy requirement under DGPC Tariff II)
|
Download |
|
|
Download |
|
|
Download |
|
|
Download |
|
|
Download |
|
|
Download |
. APPENDIX I-1_Audit report
|
Download |
. APPENDIX I-2_Audit Report
|
Download |
|
|
Download |
|
|
Download |
|
|
Download |
|
|
Download |
|
|
Download |
|
|
Download |
|
|
Download |
|
|
Download |
|
|
Download |
|
|
Download |
|
|
Download |
|
|
Download |
. BPC Application Format - CASE 1
|
Download |
. BPC Application Format - CASE 2
|
Download |
. BPC Cost of Suipply (based on DGPC gearing based DGPC Rates)
|
Download |
. BPC Cost of Supply (based on BEA Gearing based DGPC Rates)
|
Download |
. Tariff revision proposal Write-up
|
Download |
|
|
| Electrictiy Act of Bhutan, 2001 |
Download |
|
|
| Regulations |
|
.Tariff Determination Regulation 2007
|
Download |
.Accounting and Reporting Regulation 2007
|
Download |
.BEA _Regulatory Fees_ Regulations
|
Download |
.Dispute Resolution Procedure 2009
|
Download |
|
|
Download |
|
|
Download |
|
|
Download |
|
|
Download |
.LICENCE TO GENERATE, SUPPLY,
IMPORT AND EXPORT ELECTRICAL ENERGY
IN THE KINGDOM OF BHUTAN(THP)
|
Download |
.LICENCE TO GENERATE, SUPPLY,
IMPORT AND EXPORT ELECTRICAL ENERGY
IN THE KINGDOM OF BHUTAN(BHP)
|
Download |
.LICENCE CONDITIONS TO GENERATE, TRANSMIT,
DISTRIBUTE,AND SUPPLY ELECTRICAL ENERGY(BPC)
|
Download |
.LICENCE TO GENERATE, SUPPLY,
IMPORT AND EXPORT ELECTRICAL ENERGY
IN THE KINGDOM OF BHUTAN(CHP)
|
Download |
.LICENCE CONDITIONS TO CONSTRUCT
GENERATE, SUPPLY AND EXPORT
ELECTRICAL ENERGY(DHPC)
|
Download |
.LICENCE TO GENERATE, SUPPLY,
IMPORT AND EXPORT ELECTRICAL ENERGY
IN THE KINGDOM OF BHUTAN(KHP)
|
Download |
.LICENCE TO CONSTRUCT, GENERATE, SUPPLY
AND EXPORT ELECTRICAL ENERGY(PHPA-I)
|
Download |
| Annual Report 2007-2008 |
Download |
|
|
|
a. Accident Reports of BPC from July 2002 - June 2008
|
Download |
b. Accident Reports of BPC from July 2008 - June 2009
|
Download |
| Other Documents |
|
|
|
a. List of Acts & Regulations
|
Download |
b. Power Tariff Policy Presentation to BCCI, Nov 2005
|
Download |
c. Power Tariff Presentation to BCCI, Nov 2005
|
Download |
|
|
| Stakeholders Meeting, Kichu Resort, Paro 24 July 2006 |
|
|
|
a. Dispute Resolution Presentation
|
Download |
|
Download |
|
Download |
|
Download |